April 2007

Miller Freeman (Bering Sea)

     
View image at right  
FOCI Mooring Hardware Request

April 2007, Miller Freeman Cruise MF07-05

Updated: March 19, 2007

    300        
MODOperation MooringRCMkHzSeaMicroECO- Temp.Nitrate SoundTaps 
Date  9ADCPCatCatFluor SensorMeterSensor8Rel.
  Subsurface          
  Rec/Deploy 07BSP-2A   1           1   1
 Deploy 07BST-2A1  22   21
 Rec/Deploy 07BSP-4A 1     1 1
 Rec/Deploy 07BS-5A  121 12 2  1
 Rec/Deploy 07BSP-5A 1     1 1
  Rec/Deploy 07KC-1A           1       1
 Rec/Deploy 07KC-2A1  1     1
  alt: BSM-4A 07BS-4A     1 2 1 11 1     1
    Surface                    
  Deploy 07BSM-2A 1   4 3 2 11 1     1
  Deploy 07BSM-4A 1   4 2 2 11 1     1
  Total43 10 12 8 46 532 10
             
    300        
MODOperation MooringRCMkHzSeaMicroECO-
Temp.
NitrateSoundTaps 
Date  9ADCPCatCatFluorSensorMeterSensor8Rel.
  1 Cruise Information:  Kodiak, Alaska (April 18) to Dutch Harbor, Alaska (May 7)
  2 Shipping Information:  Mooring equipment for Cruise MF07-05 will be loaded on the Miller Freeman in Kodiak, Alaska
  3 NOTE: add alternate subsurface mooring 07BS-4A - to be used in place of 07BSM-4A if ice is present.