UPDATES
Field Season Updates and Schedule Changes for FY01
November 30, 2000
-
Change in CTD Responsibility: PMEL shall provide the primary
CTD system aboard NOAA Ships. The NOAA Ships will provide a secondary
CTD system in the event that the primary systems fails.
November 1, 2000
Field Season Updates and Schedule Changes for FY00
May 25, 2000
-
additional sea days added to Fall 2000 Ron Brown schedule for FOCI
April 23, 2000
-
Ron Brown suffered hull damage on her trip north through the Inside
Passage. She returned to dry dock in Seattle for repairs. All
FOCI spring cruises were canceled.
April 10, 2000
-
Applicable Standard Operating Instructions for the Ron Brown were developed
from those for the Miller Freeman.
January 27, 2000
-
Specific and standard operating templates for the Miller Freeman are modified
for the 2000 field season. SCS SENSOR.DAT information is not yet
updated.
January 26, 2000
-
Because of extensive sea ice in the Bering, the Miller Freeman will not
depart Seattle until 7 February. The first leg will have three parts:
MF00-01A, B, and C. On leg A (transit), age-1 pollock will be sampled
from the Shelikof Strait region and possible part of the Unimak CTD grid
will be occupied. On leg B, part of the Unimak grid will be occupied
for CTDs and arrowtooth flounder trawls. Leg C is the mooring cruise.
Field Season Updates and Schedule Changes for FY98
January 14
-
Added MF98-01 Final, MF98-05A Cruise Overview, MF98-05B Draft, and MF98-06
and 08 Cruise Overviews to the FOCI 1998 Field Season page.
January 9, 1998
-
Chief Scientist Check List updated in table format, and Hazardous Materials
Check List integrated into the main Chief Scientist Check List.
-
Hazardous Materials Check List for Participating Scientists added to Participating
Scientists Information page.
December 19 (1997)
-
FOCI Field Season Planning Calendar for UNOLS R/V WECOMA added to Table
of Contents page.
-
Chief Scientist Information page updated.
-
Cruise Planning Documents page updated in table format.
November 17 (1997)
-
Cruise Preparation Table of Contents referenced from Operations Page.
-
Linked cruise instructions for MF98-01(Draft) added to FY98 Field Season.
Field Season Updates and Schedule Changes for FY97
April 15
-
Hazardous Materials Plan referenced from Operations Page. It is still available
from Chief Scientist and Participating Scientist guides.
March 7
February 27
-
Chief Scientist has been changed on the MF97-05 Leg 2 cruise to examine
spring bloom conditions in the southeastern Bering Sea.
-
The on-line guide for cruise participation has been reviewed and is being
updated. The target completion date is March 7.
February 7
-
The SCS Sensor Specification for 1997 has been included as an appendix
to the Standard Operating Instructions.
-
Operations during the WECOMA cruise WE97-02 will be mooring deployment/recovery
and testing of a Multiple Plankton Sampler.
January 24
-
The 1997 Cruise Instruction template that complements Standard Operating
Instructions is now installed as an RTF file for retrieval from the Templates
page.
January 15th (1997)
-
The schedule for the FY97 field season has been modified.
-
Standing Orders for the Miller Freeman are available on the FOCI Operations
Page in RTF format.
-
Cruise Instructions for MF97-01 are available in RTF format from the FOCI
Operations Page and from the cruise schedule.
November 20th
October 9th
-
The field season schedule is being developed and should be availabe on
the WWW on or about November 1st.
Stay tuned.
-
Cruise planning documentation and cruise instruction templates will be
updated this fall for the '97 field season.
-
The first SEBSCC
PI meeting is scheduled for October 15, 1996 in Nanaimo, British Columbia,
Canada.
Update
page from FY96
Return to Field
Operations
FOCI Home Page
SEBSCC Home Page
allen.macklin@noaa.gov